Remove and replace floor covering in 704-K Maintenance Lunch Room.…
Perform repairs to the interior of Building 706-N.…
784-7A Correct/replace metering bin gear box seals.…
Verizon Wireless is upgrading the existing Mobile Access Distributed Antennae System (DAS) and multiple repeater sites located on the SRS facility …
Subcontractor will provide roof repairs at 723-15A.…
The SRS Liquid Waste contractor sends routine characterization samples from the H-area and F-area Tank Farms to the Savannah River National Laborat…
Subcontractor will provide roof repairs at 723-A.…
Subcontractor will provide roof repairs at 735-7A.…
Remove lead acid batteries from 3 installed UPS systems battery cabinets and disposition battery cabinets as scrap metal.…
Install a blank on Duct 7902 in 233-H Room 10 supply register.…