722-N, Remove Damaged Floor Tiles in Lunchroom and Dispose of Properly.…
766-H Flood Damage Repair…
Install Video Telecommunications in 703-47A Room 128.…
Renovations due to water intrusion in buildings 722-A, 703-46A AND 703-42A.…
Subcontractor will provide roof repairs at 703-6B.…
Replace old method of estimating flow by installing a flow meter with velocity sensors at the H-12 Outfall.…
Subcontractor will provide roof repairs at 785-2A.…
Install an Electric Discharge Machine (EDM) in building 234-7H (room 109) that requires a chilled water unit, electrical supply, instrument air sup…
766-H Troubleshoot/Evaluate non-working lighting in rooms 2401 and 2141.…
Replace Glovebox Glass Panel T125-304-N-03 in the Load Line 4 & 5 Finish glovebox under modified open glovebox maintenance (OGM).…