Nitrate salt simulants containing varying water concentrations will be combined with organic, wheat, kitty litter for thermal aging studies in anAc…
A series of non-rad tests will be performed to study the oxidative destruction of glycolate and/or tetraphenylborate containing solutions.…
Construction personnel will remove asbestos insulation in the Hot Gang Valve Corridor and replace with non-asbestos insulation.…
The scope of this work is the extraction of deuterium oxide and singly-deuterated water from water and deuterium oxide mixtures using combinationso…
Install Universal Wiring, UW, in Building 703-47A.…
Construction personnel will seal asbestos insulation on the duct located in the closet of Room 125 - Building 704-H.…
Inspection and treatment of wood 13.8kva Feeder power poles in L-Area.…
Remove building 707-11F and dispose in C&D Landfill.…
Install Universal Wiring, UW, in Building 730-1B.…
Overhaul of Shone Ejector number 2 located at 607-2A.…