Repair Entry Door #206 and 207 at 292-2F Fan Room.…
Replace Valve F1-905102-WW-V-016 at 905-102F Process Deepwell.…
Replace 218-2H Cooling Water Chemical Injection System. The existing chemical addition system for the 218-2H Cooling Water System is not providing…
This proposed activity entails having a roofing contractor perform concrete core drilling on the roof of H Canyon.…
This EEC addresses the siting and installation of utilities (under ground electrical supply) of the new Storm Shelter 704-39G located at Burma Road…
The K-Area Interim Surveillance (KIS) FM-200 fire suppression system will need to be redesigned to replace the soon to be discontinued Chemetron Fi…
Transition the existing Siemens PLC and touchscreen to an Emerson DeltaV controller and touchscreen operator workstation in cabinet H-234000-METL-C…
Correct leak and replace valve SW-V-001(10") at 681-3G Pump House #3.…
This activity involves installing a MicroBlower™ at existing well MRS-34. Furthermore, three existing vadose zone wells (i.e., MVE-13, MVE-17, and…
Inspection and Treatment of utility/power poles in the H Area (Canyon, HTF, General, ETF) and S/Z/J areas.…