Utilize and modification of 706-3F, 2nd floor to perform engineering classified computing task to support NNSA projects.…
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
Road 4 (2.8 miles) will be milled 2-1/2 inches, paved with 1 inch Open Graded Interlayer (OGI) and 2 inches of asphalt, striped with thermoplastic …
Road E (2.5 miles) will be milled 2-1/2 inches, paved with 1 inch Open Graded Interlayer (OGI) and 2 inches of asphalt, striped with thermoplastic …
Operation of two water jets in Building 221-33F.…
The contents of the 607-18A Trade Waste Tank will be removed, and the remaining sludge of silver will be recycled as a precious metal ratherthan di…
Re-Insulate 931- condensate tank and associated piping.…
Install phone boxes/locker units and canopy cover southwest of 704-23K for personnel to deposit cell phones prior to entry into the K-ProtectedArea…
Replace damaged and loose carpet with carpet squares to match carpet previously replaced in other areas of the building on all three floors.…
Replace the area velocity flow sensor in the culvert at liquid effluent outfall F-05.…