Railroad Island Property Funding CX(s) Applied: B1.25 Date: 08/23/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Driscoll-Naselle No. 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 08/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Raver Substation-Control House Expansion & Seismic Retrofit CX(s) Applied: B4.11 Date: 08/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Indian Creek Property Funding CX(s) Applied: B1.25 Date: 08/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Rattlesnake Butte Property Funding CX(s) Applied: B1.25 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project CX(s) Applied: B1.3 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
AT&T Fiber Addition North Bonneville-Ross No. 2 CX(s) Applied: B4.7 Date: 08/09/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Sno-King Substation Expansion CX(s) Applied: B4.11 Date: 08/08/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Disposition of Mountain Avenue Tap Line Sectionalizing Switches CX(s) Applied: B1.24 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Celilo Converter Station Curtain Wall Replacement CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration