Categorical Exclusion Determinations: Bonneville Power Administration

FY13 Environmental Drainage Upgrades at Bonneville Power Administration’s Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations CX(s) Applied: B4.6 Date: 12/03/2012 Location(s): Oregon, Montana, Washington, Oregon, Oregon Offic...
Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration
Tualatin River Pipeline Crossing Site- Monitoring Well Redevelopment CX(s) Applied: B4.9 Date: 11/08/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Franklin-Badger Canyon and Grandview-Red Mountain Switch Replacements CX(s) Applied: B1.3 Date: 10/18/2012 Location(s): Washington Offices(s): Bonneville Power Administration