Bonneville Power Administration (BPA) proposes to remedy eight impairments along the Boundary-Sacheen No. 1 and two impairments along the Sacheen-B…
Bonneville Power Administration (BPA) proposes to provide funds to the Nez Perce Tribe (NPT) to replace an existing 65-foot-long, 10-foot-wide corr…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes and Bands of the Yakama Nation (YN) Fisheries to implement a habitat…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes and Bands of the Yakama Nation (YN) Fisheries to complete a fish pas…
Bonneville Power Administration (BPA) proposes to allow AT and T/Zahler to construct a new, permanent access road within BPA's Saint Johns – Keeler…
Bonneville Power Administration (BPA) proposes to allow Clean Water Services (CWS) to access BPA fee-owned Right-of-Way (ROW) to plant, manage, and…
Bonneville Power Administration (BPA) is proposing to complete urgent maintenance on the Schultz-Wautoma No. 1 transmission line as part of BPA’s w…
Bonneville Power Administration (BPA) proposes to allow Comcast to install new aerial fiber optic cable on an existing overhead distribution line t…
BPA proposes to provide funding to the Nez Perce Tribe to realign the outlet of Indian Grave Creek where it enters the Lochsa River to enhance fish…
Bonneville Power Administration (BPA) proposes to fund the Columbia River Estuary Study Taskforce (CREST) to implement a channel reconnection proje…