BPA would enter a Power Purchase Agreement (PPA) with Oregon State University (OSU) to purchase up to 20 megawatts (MW) per hour of test energy out…
Bonneville Power Administration (BPA) is proposing to fund the Kalispel Tribe of Indians to purchase the Rocky Gorge property, a 120-acre parcel of…
Bonneville Power Administration (BPA) is proposing to remedy a distressed structure on the Holcomb-Naselle transmission line. The structure, 8/6, i…
Bonneville Power Administration (BPA) is proposing to fund the Kalispel Tribe of Indians (Kalispel Tribe) for the purchase of the Greyback Mountain…
BPA proposed to sell about 4.5 acres of BPA fee-owned property to Douglas County Public Utility District (Douglas PUD). Douglas County PUD also see…
CX-034341: Piscivorous Fish Status and Trend Monitoring in the Columbia River Upstream of McNary Dam
BPA is proposing to fund the Washington Department of Fish and Wildlife (WDFW) to conduct research intended to analyze the temporal and spatial pre…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of Grand Ronde (CTGR) to implement a channel restoration project alo…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Colville Reservation (CTCR) to construct eight large wood str…
BPA proposes to replace three deteriorating wood pole structures and associated structural/electrical components (e.g., cross arms, insulators, guy…
BPA proposes to allow the Public Utility District (PUD) No. 1 of Douglas County (Douglas County PUD) to reconductor their Valhalla-Rapids No. 1 115…