The Bonneville Power Administration (BPA) proposes to install regional remedial action scheme (RAS) controllers inside the control house at BPA’s S…
Bonneville Power Administration (BPA) proposes to fund the Oregon Department of Fish and Wildlife (ODFW) to install fish screens, headgates, and wa…
Bonneville Power Administration (BPA) proposes to update the existing Supervisory Control and Data Acquisition (SCADA), Sequential Events Monitor M…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Warm Springs Reservation of Oregon (CTWS) to remove western j…
Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) power circuit breaker (PCB) and to complete additional equipment …
Bonneville Power Administration (BPA) proposes to reconductor the first two spans (approximately 250 linear feet) of the 138-kilovolt (kV) Heyburn-…
BPA proposes to reconfigure bays and install new equipment inside the existing BPA Pearl Substation in Sherwood, Oregon. The proposed work would ac…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of Grand Ronde (CTGR) to implement vegetation replanting at the Chah…
Bonneville Power Administration (BPA) proposes to replace the existing perimeter fence in-kind at Two Mile Road Substation. The project would reali…
Bonneville Power Administration (BPA) is proposing to replace 5 deteriorating wood pole structures and associated hardware and guy wires on the Ree…