Tualatin Valley Water District Waterline Land Use Review Request CX(s) Applied: B4.9 Date: 12/31/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Continuation of Yakama Nation Sturgeon Management Project CX(s) Applied: B1.20 Date: 12/27/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Sale of Lakeside Radio Station CX(s) Applied: B1.24 Date: 12/27/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Williams Northwest Pipeline Land Use Review Request CX(s) Applied: B4.9 Date: 12/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Finely Creek and North Valley Creek Property Funding CX(s) Applied: B1.25 Date: 12/27/2012 Location(s): Montana, Montana Offices(s): Bonneville Power Administration
Columbia Rural Electric Association Walla Walla Hydroelectric Project CX(s) Applied: B4.1 Date: 12/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line CX(s) Applied: B1.3, B1.13 Date: 12/19/2012 Location(s): Washington, Idaho Offices(s): Bonneville Power Administration
Pasco Land Acquisition CX(s) Applied: B1.24 Date: 12/17/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Lane Substation 500/230-kV Transformer Phase Separation Project CX(s) Applied: B4.6 Date: 12/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Alcoa Power Sales Contract CX(s) Applied: B4.1 Date: 12/04/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration