Revenue Meter Replacement at Benton County Public Utility District’s (PUD) Finley Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Revenue Meter Replacement at Oregon Trail Electric Co-op’s (OTEC's) West John Day Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration
Coulee-Westside Transfer Trip Replacement CX(s) Applied: B1.7 Date: 02/06/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Eugene Substation Protective Relay Installation CX(s) Applied: B1.7 Date: 01/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Provision of Funds to Acquire a Conservation Easement Over the 310-acre Coyote Creek property. CX(s) Applied: B1.25 Date: 01/23/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Rogue-Gold Beach No. 2 Disconnect Switch Replacement CX(s) Applied: B4.6 Date: 01/08/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Beck Road Substation Meter Installation CX(s) Applied: B1.7 Date: 01/07/2013 Location(s): Idaho Offices(s): Bonneville Power Administration
Roosevelt Radio Station Emergency Generator Removal and Replacement CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Bertelsen Substation Metering Panel Segment Addition CX(s) Applied: B1.7 Date: 12/31/2012 Location(s): Oregon Offices(s): Bonneville Power Administration