Olympia Substation NERC-CIP Upgrade CX(s) Applied: B2.5Date: 11/12/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
November 12, 2015Olympia Substation NERC-CIP Upgrade
CX(s) Applied: B2.5
Date: 11/12/2015
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to upgrade the current security systems at the Olympia Substation control house to be in compliance with security standards established by the North American Electric Reliability Corporation’s Critical Infrastructure Protection (NERC-CIP).
CX(s) Applied: B2.5
Date: 11/12/2015
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to upgrade the current security systems at the Olympia Substation control house to be in compliance with security standards established by the North American Electric Reliability Corporation’s Critical Infrastructure Protection (NERC-CIP).