Chief Joseph-Foster Creek Underground Fiber Optic Cable Installation CX(s) Applied: B4.7Date: 09/14/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 14, 2015Chief Joseph-Foster Creek Underground Fiber Optic Cable Installation
CX(s) Applied: B4.7
Date: 09/14/2015
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to install approximately 0.5 mile of underground fiber optic cable between BPA’s Chief Joseph Substation and Douglas County Public Utility District’s Foster Creek Substation.