D Analog Communications Retirement at Del Rio, Chief Joseph, and Foster Creek CX(s) Applied: B1.19 Date: 08/06/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Wautoma-Ostrander Surface Impairment Removal CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration
North Bonneville-Midway No. 1 Tower 75/4 Replacement CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
Short-term Additional Amendments to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 07/23/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Columbia and Willamette River Crossings Liquefaction Hazard Assessment CX(s) Applied: B3.1 Date: 07/23/2012 Location(s): Oregon, Oregon, Washington, Washington Offices(s): Bonneville Power Administration
Hills Creek-Lookout Point No. 1 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Schultz-Raver No.1 Right-Of-Way Marking Project CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration