Categorical Exclusion Determinations: Bonneville Power Administration

Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Insulator Replacement on North Bonneville-Midway No. 1 Transmission Line (update to previous CX issued 7/16/13) CX(s) Applied: B4.6 Date: 11/12/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Upgrade Six Wireless Communication Sites (Clear Creek, Evergreen, Fruit Valley, KSLM, Minnehaha, Popcorn) CX(s) Applied: B1.19 Date: 11/06/2013 Location(s): Oregon, Washington, Washington Offices(s): Bonneville Power Administration
Fiber Upgrades at Bonneville Power Administration (BPA) Teton Wireless Communication Site CX(s) Applied: B4.7 Date: 11/05/2013 Location(s): Wyoming Offices(s): Bonneville Power Administration
"Equipment Additions to the Ostrander and Pearl Substations and Dittmer Control Center
CX(s) Applied: B1.7 Date: 11/01/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration"