Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration
Forest Grove-McMinnville #1 Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Spring Basin Wilderness Land Exchange CX(s) Applied: B1.25 Date: 06/05/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Grand Coulee-Bell No. 3 Double Circuit 230 Kilovolt Transmission Line Reconductoring Project CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration
Oregon City-Chemawa #2 Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Tunk Mountain Radio Station Upgrade CX(s) Applied: B1.19 Date: 05/30/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Upgrade of the Secondary Containment System at Bonneville Power Administration’s (BPA) Santiam Substation CX(s) Applied: B4.6 Date: 05/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Wood Pole Structure Replacements on the Chehalis-Olympia No. 1 and Chehalis-Mayfield No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/25/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Bettas Road-Columbia No. 1 230 Kilovolt Transmission Line Thermal Upgrade CX(s) Applied: B4.13 Date: 05/25/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration