Lightspeed Network's Fiber Installation near Pilot Butte Substation CX(s) Applied: B4.7 Date: 01/15/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Longview-Cowlitz Fiber Optic Cable Upgrade CX(s) Applied: B4.7 Date: 01/06/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Revenue Meter Installation at Wind River Biomass Facility CX(s) Applied: B1.7 Date: 12/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Equipment and Property Transfers with Three Public Utilities in Oregon, Idaho and Washington CX(s) Applied: B1.124 Date: 12/26/2013 Location(s): Oregon, Idaho, Washington Offices(s): Bonneville Power Administration
Crooked Creek 3 and Deep River Mouth 2 Property Funding CX(s) Applied: B1.25 Date: 12/18/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Xeriscaping at Four Facilities CX(s) Applied: B1.3 Date: 12/11/2013 Location(s): Oregon, Oregon, Washington, Montana Offices(s): Bonneville Power Administration
Fence Replacement on the Latham Tap Transmission Line Corridor CX(s) Applied: B1.3 Date: 11/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Ninemile Creek Lower Property Funding CX(s) Applied: B1.25 Date: 11/26/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Wanacut Creek Upper Property Funding CX(s) Applied: B1.25 Date: 11/26/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Aeneans Creek Spring Property Funding CX(s) Applied: B1.25 Date: 11/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration