Categorical Exclusion Determinations: Bonneville Power Administration

Burial of Overhead Fiber Optic Cable at Grand Coulee Radio Station CX(s) Applied: B4.7 Date: 04/21/2014 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Cowlitz Falls Fish Facility and Fish Transfer Facility Property Transfers CX(s) Applied: B1.24 Date: 04/21/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Line Tap Construction on the East Ellensburg Tap to Columbia-Ellensburg Transmission Line CX(s) Applied: B4.6 Date: 04/11/2014 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
B3S4-White Bluffs Number 1 and Benton-B3S4 Number 1 Transmission Line Reroute CX(s) Applied: B4.13 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration