CX-013789: Categorical Exclusion Determination

Ross Complex Sally Port Entrance Relocation CX(s) Applied: B4.7Date: 06/25/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

June 25, 2015
Estimated Read Time   min
Ross Complex Sally Port Entrance Relocation
CX(s) Applied: B4.7
Date: 06/25/2015
Location(s): Washington
Offices(s): Bonneville Power Administration

necessary because the existing system is inadequate and inefficient. All work would take place within Bell Substation. Modifications include moving the existing HVAC units from its current location adjacent to the control house to its roof, removal and replacement of ductwork, replacement of some portion of