South Mountain Communication Site Back-up Generator Replacement CX(s) Applied: B1.3Date: 06/11/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
June 11, 2015South Mountain Communication Site Back-up Generator Replacement
CX(s) Applied: B1.3
Date: 06/11/2015
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to maintain a total of about 3.2 miles of existing serviceable access and structure spur roads spread over numerous locations. The work would include minor blading, shaping, grading and adding three to six inches of 3-inch minus crushed gravel to.