CX-013987: Categorical Exclusion Determination

Badger Canyon Substation Upgrades CX(s) Applied: B4.6Date: 07/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

July 21, 2015
Estimated Read Time   min

Badger Canyon Substation Upgrades
CX(s) Applied: B4.6
Date: 07/21/2015
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration proposes to upgrade equipment at its Badger Canyon Substation, located in Benton County, Washington.

Document(s) Available for Download