Installation of a A Ductless Mini-Split HVAC system to provide supplemental cooling for building 730-A room 171.…
The following work will be completed in the Functional Test Station (FTS): replace the filament and ion gauge for the Real Time Mass Spectrometer a…
Bonneville Power Administration (BPA) proposes to repair and improve access roads along the Driscoll-Naselle 115-kV No. 1 transmission line between…
The EEC covers the renovations to the interior of building 711-9N.…
Replace Bar Screen Conveyor at CSWTF.…
Replace CSWTF Grit Concentrator.…
Bonneville Power Administration (BPA) proposes to rebuild its Hood River Co-Op Service No. 1 transmission line from Hood River Substation to struct…
DOE plans to deactivate, demolish, and disposition ancillary structures at the Paducah Site that supported the former uranium enrichment facilities…
Replace the existing Perfluoroalkyl substances (PFAS) deluge fire suppression system in B-64 and B-92 with a new water-based fire suppression syste…