Purpose: To ensure the safety and reliability of the bulk electric system.…
BPA proposes to correct one impairment on the John Day-Grizzly 500-kV No. 2 line and provide access road improvements and reconstruction to access …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace an existing 13.8-kV circuit breaker at PacifiCorp’s (PAC…
Removal of dead and dangerous trees outside of the existing ROW along multiple overhead distribution lines in Benton Harbor, Three Rivers, and Buch…
This work consists of providing all materials, tools, equipment, supplies, transportation, facilities, labor supervision and services required incl…
Activities planned include the cutting of dead trees at 5,701 locations in which 10 to 15 feet of the tree is left above ground level for wildlife …
The U.S. Department of Energy (DOE) proposes to continue on-going and future vegetation management activities aimed at reducing risk of, and potent…
The Project involves reconductoring the underground portion of the North Dublin-Cayetano 230 kilovolt (kV) transmission line to achieve the required capacity requested by an Interconnection Customer.
The Project entails replacing the existing TSV disk seals, body seats, and hardware, repairing (refurbishing) the trunnions and replacing the trunnion packing seals and trunnion bearings.
Remove current playground and replace with larger play surface and concrete path to play area…