Maintenance Dredging of River Water Intake Canal 681-3G.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform routine maintenance activities and custodial services for buildings, …
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform routine maintenance activities and custodial services for buildings, structu…
Grading of the exterior of 760-11G and the installation of a drainage system, to prevent further water intrusion.…
The site plans to complete additional roadway resurfacing on Road C this FY '24 (likely around the Mar/Apr timeframe). The section of roadway from …
The 151-1C and 151-2C substation batteries and battery racks will be replaced due to age and the batteries being obsolete.…
Replace All Non-Emergency Light Fixtures at 730-2B.…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is required. These excavation activiti…
This EEC covers exterior painting in N area.…
Reinsulate pipe on water heater in 704-4N…