This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is NOT required.…
The H-Area Tank Farm (HTF) facility needs a permanent design for supplying Chromate Water (CRW) to Tanks 35-37 above grade due to a recent undergro…
WAPA proposes to replace spacers on its CPJ-ODA transmission line.…
Paint Trailer Space Door Exterior and Entrance (Pavement) Area…
Repair Drywall at 730-2B.…
Perform Containment Modifications at 780-2A.…
This EEC covers all maintenance activities performed by SRNS organizations that have the potential to disturb gasket and gasket-like materials (i.e…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road maintenance on existing roads used t…
The existing 12V Group 8D Interstate batteries (Part No. 8D-MHD) will be replaced with a 12V Trojan Battery Group 8D-AGM Dual Purpose (Part No. Mot…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road maintenance on existing roads used t…