Pole changeouts
WAPA proposes to replace insulators along the ODA-TCY transmission line. To accomplish this task, one landing zone (LZ) outside the right-of-way T…
731-N Repair toilet.…
Replace three diesel power plant silencers (including an improved foundation, structural supports, and protection from the elements) and four radia…
The existing Environmental Control (EC) Programable Logic Controller (PLC) is obsolete and will be upgraded with an Emerson's DeltaV module.…
Bonneville Power Administration (BPA) proposes to raise and/or relocate six wood pole structures along the Shelton-Fairmount No. 2 transmission lin…
BPA proposes to perform routine road maintenance along BPA's Little Goose-Lower Granite No. 1 transmission line which involves reconstruction and r…
Repair Containment Dike 622-N.…
The scope of this work is to mill, pave, install rumble strips and stripe approximately 4.7 miles of remaining section of Road C.…
Remodel the east and west foyers of building 705-3C.…