Air Diffuser Replacements at 766-H.…
Remove Power to the 284-13H and 284-15H Sealand Containers.…
701-4G Remove/replace flooring.…
The proposed activity is to isolate the discharge pathway (Manhole P34) of industrial wastewater generated in F-Area Complex (FAC) from the 281-5F …
Install solar pumping station at river water valve pit.…
The Building for 789-B serves as the back-up water treatment facility for the Site's domestic water system. The building was last upgraded in 1994.…
Install Panzone Cabinet in 714-2N.…
Install Panzone Cabinet in 704-74F .…
CX-029744: Routine Administrative, Monitoring, and Maintenance Activities at Gnome-Coach, New Mexico
DOE-LM isproposing to conduct routine administrative, monitoring, and maintenance activities at the Gnome-Coach, New Mexico, Site, located approxim…
The U.S. Department of Energy (DOE) plans to deactivate, demolish, and disposition ancillary structure C-301 at the Paducah Site that supported the former uranium enrichment facilities and is aging and/or deteriorated, and no longer needed.