Paint R Area wells RRP 6D and RRP 7D.…
The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) proposes new formula rates for firm and nonfirm pointto-point (P2…
This Amended Determination follows the approval of additional funds and extended period of performance to support the project team's small-scale, r…
Provide services to refurbish the hot water basin, cold water basin and fill sections of the 218-2H cooling tower cells.…
Remove invasive vegetation and clean out the header pipe at the H-02 engineered wetlands cells.…
Treatability Study in D-area to support D-Area Groundwater Remediation…
The HANM Gas Blend turbo pump and controller will be replaced per design change package.…
This EEC covers various routine maintenance activities that occur in the Savannah River Tritium Enterprise (SRTE) Limited Area.…
The Subcontractor shall provide periodic wellbore fiber optic mobile interrogation services at one or more SPR sites.…
Subcontractor will perform roof repairs on 773-41A. The Subcontractor will not disturb the existing roof on 773-41A.…