Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 6/2- 8/14 on the Pilot Butte-Copper …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Boysen-Pilot But…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Lingle-Limestone …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to use its existing Garland (GD) Substation as a laydown yard to su…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Eckley-Wray (TS) …
Installation of Wi-Fi in 713-N.…
Replace the 105-L Chiller Unit and system water pump per MT-LCR-2021-00002.…
The scope of this work order is to remove and replace 704-2H HVAC Unit No. 1. The electrical supply will be replaced and upgraded to 30 amps.…
284-19H/20H Replace floor tiles.…