Repair cracks, joints, and patchwork (spalling) on concrete intruder barrier at R-Area Seepage Basin…
731-1N Break Room Remodel Room No. 101.…
192-2K Fire Water System Jockey Pump Controller Replacement (Electric and Diesel).…
H-Canyon and Outside Facilities TSR (S-TSR-H-00006, Rev. 17), Section 5.7.2.35 states that "The Backup Vessel Air Purge Program shall be establishe…
Repair Wall Damage Under Window in 773-65A Room 12.…
Perform preventative maintenance and repair loose fill in cooling tower.…
The existing Programable Logic Controller (PLC) is old and a newer upgraded PLC is needed.…
The Outdoor Firing Range Project will complete maintenance activities to replace soil that has eroded over years of nonuse.
Replace Unit No. 1 10 ton HVAC.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to repair security fencing at the existing Buffalo Head Switchyard …