Replace light fixtures with LEDs at 717-10N/711-9N/711-N, 711-1N, and 711-2N. Replace 1 electrical wall heater in 711-9N and 5 electrical wall heat…
K-Area Trailers Repair…
Re-route of structures 34-5 through 35-4 of ED-FO line downed by flood. This will involve a combination of steel and wood poles on three peninsular…
This Amended Determination follows the approval of additional funds, period of performance, and new project performer (magniX USA Inc.) to support …
The Bonneville Power Administration (BPA) is proposeing to continue annual funding the Washington Department of Fish and Wildlife (WDFW) for Operat…
Seal coat and restripe the parking lot at 705-A.…
Repair sheetrock 766-H located in room 1061.…
Rebalance of 766-H Hot Water System.…
Repair sheetrock at 284-7H.…
766-H (Foodcourt) Pressure wash concrete at West Entrances and area where grease recycle tank is stored.…