Install Ladder Guard System on A-Area Storage Tank 782-2A.…
Install two fiber cables into the conference room at 730-2B.…
Structural inspection of the primary and secondary structures associated with 291-H.…
Replace obsolete Saltstone Screw Feeder Schenck Controls with a new vendor supported equipment.…
772-1F Repair cracks in mortar joints of block wall on north side.…
Perform various repairs to trailers 704-33L, 704-34L, 704-35L, 704-36L, and 704-37L. Portalets to be used while restrooms are out of service.…
Cleanup possible asbestos material outside of 618-G. Repair PACM piping inside of 618-G room 201.…
Bonneville Power Administration (BPA) proposes to fund several entities to conduct deferred maintenance at multiple hatchery facilities in the Colu…
The Spent Material Sampling System (SMSS) is out of service and no longer operational. Since the SMSS is no longer operational, the pressure relief…
This work consists of removing an out-of-service safety shower/eyewash station and its indicator light from Room 35 in 233-H. This D and R is to pr…