LM is proposing to transition the Conquista, Texas, Disposal Site, located approximately 50 miles southwest of San Antonio, to LM ownership and lon…
Subcontractor shall provide all supervision, transportation, labor, materials and equipment to locate, excavate, and inspect an internal corrosion …
Renovation of 737-G…
The scope of this work is to remove and replace the rusted roof panels on the CWR basin.…
Repair door trim hardware in sample aisles on 3rd level in both hot and warm canyon.…
Replace Dog Kennel Fence Post at 703-10B.…
Repair/Replace 4 feet x 6 inches Wooden platform and ladder.…
LM is proposing to conduct routine administrative, monitoring, and maintenance activities at the Canonsburg, Pennsylvania, Disposal Site to ensure …
Abrasive blasting steel structures for coating applications performed by construction forces in the 725-2N Blast Building/Yard.…
The proposed activity (PA) is the design, review, and implementation of Temporary Modification (TMOD) M-TMOD-Z-00007. The process vessel ventilatio…