Drill cylinder holes in doors to accept lock cylinder and install emergency exit device and trim. This work requires access to both sides of the do…
Correct broken portion of existing well access bridge for HPZ 003A well at H-Base Injection. Bridge is located in a soil contamination area.…
Confined Space Mock-up Trainer Modifications in Room 1056 of Building 766-H.…
Clean Out the Desiccant in Air Dryers at 285-H.…
Sliding Door Repair at 763-52N…
Bonneville Power Administration (BPA) proposes to fix a number of impairments, and complete switch work and substation work on the Forest Grove-McM…
Bonneville Power Administration (BPA) is proposing to remediate a slide along the Port Angeles-Sappho No. 1 transmission line. The slide is placing…
Bonneville Power Administration (BPA) proposes to replace 58 deteriorating wood poles and associated structural/electrical components (e.g. cross a…
Activities to troubleshoot, repair and/or replace light fixtures in building 105-C.…
Perform Housekeeping Radiological Areas using HEPA Vacuum in Solid Waste Management Facility…