DMEA plans to clear approx. 35 miles of ROW clearing on a specific circuit that runs from 6,000-over 10,000ft. elevation.…
LM is proposing to perform repairs on extraction wel ls 1089 and 1109 at the Shiprock, New Mexfoo, Disposal Site. Repair activities would include r…
It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide pow…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Mary's Lake-East…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Transmission and…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Ault-Craig (AU-C…
This Acknowledgement of Scope provides for the replacement of the front entrance door on the West side of building 7No. 03-1B.…
Install Telecommunications in New Cubes in 704-1N.…
Temporary Power is to be supplied to the Defense Waste Processing Facility (DWPF) Melter Dome Heathers during planned power outage.…
Remove existing material (gravel) to a depth of 6 inches and resurface with 6 inches of asphalt at various locations at SRS.…