Pump Out Waterjet Tank in 773-50A.…
Facility and Site Services (F and SS) proposes to mow certain two-track roads (priority 4) to mitigate for potential wildland fire dangers stemming…
The TEF Platform Mounted Robotic Arms (PMRA) are from 2003 and upgrade modifications are necessary for continued operation. The Proposed Activity i…
Bonneville Power Administration (BPA) is proposing to allow Portland General Electric (PGE) to replace two of its wood pole structures located on B…
Upgrade Universal Wiring to CAT 5e in 731-1N.…
Replace submersible pump with two Gould 3171 ST vertical Sump Pumps Size: 1.5x3-6/5V.…
Remove and abate mastic tile floor and refinish concrete in 284-10F.…
Railroad Crossing Replacement at Road F and Main Line (Hillman Siding/Signal 07) and Road 6 and Main Line (Signal 11).…
Temporary Modification to provide an alternate power source to Motor Control Center (MCC) B907 from B202-2E during B9 outage.…
The access areas near Mays Ranch, and those immediately surrounding them, are most often used by BLM grazing permittees to access established grazi…