Install electrical components, conduit, and run cable from 711-6N to 711-9N per TOA-22EMS-10-067 for communications subcontractor to terminate and …
Replace the existing Cold Feed Chemical Systems Caustic Transfer Pump (422-010-031-00-P), system NAK with a state-of-the-art transfer pump since th…
The EEC covers refurbishing aboveground fuel tanks 619-2N, 619-4N and 715-3N.…
Install Sample Tap Modifications to 782-A Service Water Header.…
Correct Drainage Issues at 719-5N.…
Bonneville Power Administration (BPA) proposes to allow T-Mobile to upgrade their wireless network antennas and equipment and to upgrade structure …
The Bonneville Power Administration (BPA) proposes to replace three deteriorating wood pole structures along the Horse Ranch Tap to Monroe-Snohomis…
Bonneville Power Administration (BPA) proposes to replace several wood pole structures that are damaged and are in need of repair immediately.…
Terminal Engineering and Manufacturing (TEM), was selected to design an almost like-for-like diffuser to replace the old JMIs diffusers during fail…
It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide pow…