The EEC covers the renovations to the interior and exterior of building 717-F.…
Remodel/Repair Restrooms in 731-2N, 731-3N and 731-4N.…
Road B (9.7 miles) will be milled, paved, striped with thermoplastic, and edge dressed with topsoil and grassing.…
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of one wood pole structure utilizing “light touch” removal techniques…
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of 4 wood pole structures and associated structural/electrical compon…
This scope of work (SOW) focuses on the installation of fiber optic cabling and supporting infrastructure through the Argonne outside cable plant c…
LM is proposing to conduct administrative actions, routine operations, and maintenance activities at the Tuba City, Arizona, Disposal Site.…
Routine Operating and Administrative Activities (ROAA)-NCR: KCNSC23-01.…
Bonneville Power Administration (BPA) proposes four revised pulling and tensioning sites on the Central Ferry-Lower Granite No.2 transmission line …
This Amended Determination follows the approval of additional project funding and period of performance to continue the project team's information …