Terminal Engineering and Manufacturing (TEM), was selected to design an almost like-for-like diffuser to replace the old JMIs diffusers during fail…
It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide pow…
This EEC addresses the MT to design and install new rotameters to replace the obsolete rotameters in the 234-H Tritium Air Monitoring system.…
Abrasive blasting steel structures for coating applications performed by construction forces in the 725-2N Blast Building/Yard.…
This EEC supports the repair of the Air Handling Unit No. 3 at Building 772-F.…
Paint piping at 905-53A. Evaluate and Correct Well 905-53A.…
Bonneville Power Administration (BPA) is proposing to allow Portland General Electric (PGE) to replace two of its wood pole structures located on B…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (for example, cross arms, insulators, gu…
Roof Repair/Replacement K-Area Assembly, 910-A, and Local Area…
The lighting will be replaced with LED lighting throughout the area.…