There is currently an installed Breathing Air (BA) header that feeds in portable BA through the hatch wall and ceilings to various locations in th…
Bonneville Power Administration (BPA) proposes to replace insulators along the North Bonneville - Troutdale No. 1 230 kV and the North Bonneville-R…
This EEC covers various general renovations for Building 786-A, such as flooring/cove base replacement, door replacement, ceiling tile replacement/…
Minor renovations will take place in the SREL "brooder house" animal holding facility.…
Removal of old Compressor tank and installation of new one.…
Evaluate and correct water damaged tiles in 221-H, section 9 personnel tunnel.…
Provide dedicated circuits for new printers in room 213 in 773-52A.…
The project will upgrade three 4 kV circuits to more dependable 12 kV circuits, with replacement of poles, hardware, and transformers that have rea…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 0-1 to 8-2 and conduct routine acces…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Craig-Rifle (CRG…