Replace 2 sets of wooden stairs at 704-16B with aluminum.…
Installation of Wi-Fi in 708-1B.…
Paint office 43 at 703-43A.…
Portions of the SRTE and H-Area process sewer will be flushed to the H-12 outfall as a facility maintenance activity to determine the source of the…
The Knolls Laboratory (Site) Entrance Utilities Replacement Project (Project) encompasses the removal and replacement of several underground utility sections, some of which are in excess of 70 years old.
Produce cost and design study that can be used to develop a plan for the potential future adaptation and modification and operation of the Watford …
The Knolls Laboratory (Site) Security Upgrade Major Construction Project (Project) encompasses the installation of various upgrades to Site security buildings and infrastructure that is over 65 years old. The upgrades will improve Site physical security and operational efficiency. Existing security infrastructure and buildings will be remediated and demolished as part of the Project.
During a walkdown of EBR-I on 10 April 2024 to determine pre-season maintenance needs [EBR-I Interior Maintenance, EBR-I Parking Area Maintenance a…
713-2N and 3N Upgrade all bay lights with LED lamps.…
704-1N Install speakers and route cable.…