This EEC will cover general renovation activities in 735-2A.…
Radiological Protection (RP) has identified a curb on second level where contamination is leaching out of the concrete creating an Airborne Radioac…
Paint sealands behind 704-C.…
706-N Freeze damage repair.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Pilot Butte-Coppe…
The purpose of this project is to return the emergency spillway at PAR Pond to as close to its original design configuration as feasible. The area …
Due to normal age and wear, five steam poles have been identified for replacement. Parts are direct replacements. Steam poles will be replaced util…
766-H Building renovations.…
Subcontractor shall provide labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision to perform work in …
Contractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision, and services necessary to perfo…