Bonneville Power Administration (BPA) proposes to rebuild its Hood River Co-Op Service No. 1 transmission line from Hood River Substation to struct…
Bonneville Power Administration (BPA) proposes to remove and replace transmission structures and to remove and restring conductor and fiber optic c…
Replace lights with LEDs in building 713-N.…
Install a door and casing between rooms 520 and 518.…
Evaluate and correct fire barrier wall in Room 1018 at 766-H.…
Subcontractor will provide roof repairs at 701-13G.…
The proposed activity is to perform an entry and inspection into the 294-F and 294-1F sand filters.…
Replace HEPA filter on Nilfisk vacuum. Vacuum is use on asbestos related jobs.…
The Utility Infrastructure Project (UIP) includes improvements to sitewide utilities to support Fermilab's mission over the next 40 years.…