The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts transmission and distribution line structure replacements in se…
LM is proposing to conduct routine activities at the Central Nevada Test Area (CNTA), Nevada Offsite (NVOS) located in central Nevada 70 miles nort…
The entire 3-story, 32,355 square feet, building interior will be reconfigured to serve as a training facility to meet current and upcoming functional needs.
LM is proposing to conduct routine activities at the Rio Blanco, Colorado, Site, an NVOS location.…
BPA proposes to perform in-kind replacement of 46 wood pole structures and associated structural/electrical components (for example, cross arms, i…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (for example, cross arms, insul…
Bonneville Power Administration (BPA) proposes to rebuild its approximately 20-mile-long, 115-kilovolt (kV) Benton-Scooteney No. 1 transmission lin…
The U.S. Department of Energy’s (DOE) National Renewable Energy Laboratory proposes to remove razor wire and repair green screen fencing at NREL’s …
LM is proposing to conduct routine activities at the Rulison, Colorado, Site, which is an NVOS site.…
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of 48 wood pole structures utilizing “light touch” removal techniques…