Remodel to provide new plumbing, electrical, HVAC, fire protection, egress, asbestos remediation, and historic windows.…
The existing H-Canyon Railroad Tunnel (RRT) rollup door has exceeded its expected lifespan and needs to be replaced.…
Replace 731-N HVAC with a new system.…
Prepare and paint 10-foot metal building walls with a 10-foot parapet wall above the roofline.…
BPA proposes to perform in-kind replacement of structure 12/4 of the Eugene-Alvey No. 2 transmission line.…
This EEC addresses the MT to design and install new rotameters to replace the obsolete rotameters in the 233-H Tritium Air Monitoring system.…
The Process Computer System (PCS) for the Function Test Station (FTS) is beyond its service life and needs to be replaced.…
LM is proposing to replace the southern boundary gate at the Gas Hills North, Wyoming, Disposal Site in Fremont County.…
This EEC covers various routine maintenance activities that occur in and around the buildings within the SRPPF Complex Area.…
The Bonneville Power Administration (BPA) plans to remove existing transmission structures, replace select transmission structures in the same loca…