LM is proposing to conduct routine administrative, monitoring, maintenance, and aerial survey activities to fulfill requirements of the site's Long…
Bonneville Power Administration (BPA) is proposing to replace multiple deteriorating wood pole structures and associated hardware at specific locat…
Subcontractor will perform roof repairs on 723-A. The Subcontractor "will not" disturb the existing roof on 723-A.…
C. E. Bourne Subcontractor 00000611 will perform a roof repairs on 735-11A. The Subcontractor "will not" disturb the existing roof on 735-11A.…
Subcontractor will perform a roof repairs on 749-A. The Subcontractor will not disturb the existing roof on 749-A.…
Replace all floor tiles at 702-1C per Acknowledgement of Scope.…
An underground leak in the Cooling Water System (CSW) piping has been detected. A temporary CSW feed to Melter Cooling Water (MCW) is needed during…
Replace glovebox oxygen alarm panel annunciator in Control Room of Building 264-H.…
The 211-8H women's restroom is to be remodeled to remove the shower and the existing 2 inch shower drain line and replace it with a 4 inch drain l…
The general services H-Canyon Hot and Warm Crane Controls currently operate on obsolete programmable logic controller processors.…