Subcontractor will perform a roof replacement on 192-2K. The Subcontractor will disturb the existing roof on 192-2K.…
Install plug in sewer manhole to isolate 284-H from the sanitary sewer system.…
Install UW drops for cubicle replacement in 703-43A.…
C. E. Bourne Subcontractor will provide roof repairs at 701-2L. The Subcontractor will not disturb the existing roof while performing these repairs…
This EEC is for the placement of grout inside manhole P5 of the abandoned process sewer line north of 211-H.…
The 786-5A Trailer is an older structure (Occupied) and needs all the windows repaired from water intrusion by leaking windows. Additional building…
Remove and replace the damaged retention pond drain system and clean out the accumulated debris within the pond.…
Demolish and remove (D and R) 719-H South (front) and West (side) exterior double doors, frames (if needed), and lock assemblies.…
There is currently an installed Breathing Air (BA) header that feeds in portable BA through the hatch wall and ceilings to various locations in the…
Design, fabricate, and install one new Non-Nuclear Reconfiguration (NNR) Calorimeter to replace the NNR in 234-H. The NNR Calorimeter has been in s…