T3 transformer in the L reactor area is being replaced. EP number is 105L-573.3. CLI number is L-105000-NEP-SWGR-T3-XFMR-3.…
This EEC covers various routine maintenance activities that occur in and around the buildings within the SRPPF Complex Area.…
Cut valve internals out and replace, welding and grinding is required.…
Remove existing carpet tiles, floor tiles and mastic beneath carpet in room 216 and 36 in 234-H. Place new mastic and carpet in both rooms.…
Construction Craft to paint office areas in 248-H. Prior to painting, they will repair damaged wall surfaces by filling and sanding them smooth. Vi…
Assess and replace 234-H roof drain piping as applicable.…
Replace 233-H ELU-1 and ELU-5 lights with Light Emitting Diodes (LEDs) per E-DCF-H-09681…
Proposed activity will cover the various Temporary Modifications associated with the B4 Outage. Load Center (LC) B4 will be de-energized to perform…
This EEC covers various general renovation activities for Building 773-41A. Scope includes D and R such as replacing sink, associated piping and el…
This EEC covers various general renovation activities for Building 773-42A. Scope includes D and R such as replacing sink, associated piping and el…