The EEC covers the renovations to the interior of building 711-2N.…
This EEC covers various general renovations for Building 773-45A.…
The work consists of scraping the peeling paint on the ceiling of various offices and repainting them, removal of the existing carpeting throughout…
The subcontractor, Queen City Railroad Construction, shall replace wooden line ties from the railroad bed, identified by site transportation and en…
The Chemical Process Cell (CPC) Purge Air Receiver is too small for the flowrate needed by the CPC vessels.…
The failed roofing system on the 704-L roof will be demolished and replaced. This will prevent numerous leaks that currently plague the building.…
Filters will be replaced, units will be DOP tested and ventilation tested.…
Replace a door at building 701-3G (Barnwell Barricade).…
The current battery bank substation in 251-H will be removed and replaced with new batteries of the same type.…
703-46A Install 1 UW Drop in Room 266.…