702-A Install Keri door on entry No. 4.…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
Bonneville Power Administration (BPA) proposes to interconnect Columbia River Public Utilities District (CRPUD) newly constructed Deer Island subst…
The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is proposing to do a general cleanout of the Tuba City, Arizona, Disposal Site…
The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is proposing to: conduct routine activities throughout the year, including ins…
Bonneville Power Administration (BPA) proposes to improve existing access roads along the Toledo-Wendson Number 1 transmission line in southwestern…
Remodel 713-N Room 7.…
Rev. 0: Site construction will be replacing the bolts on catwalk/ladder and painting the M-1 Air Stripper and associated components as well as the …
T3 transformer in the L reactor area is being replaced. EP number is 105L-573.3. CLI number is L-105000-NEP-SWGR-T3-XFMR-3.…
This EEC covers various routine maintenance activities that occur in and around the buildings within the SRPPF Complex Area.…