703-45A Bathroom renovations.…
Renovate the 751-1A Men's restroom, offices, kitchen, and hallway. Replace flooring in the kitchen.…
AM and DO Warehouse Personnel will use a floor scrubber to clean the floors of the warehouses at 731-1N, 731-2N, 731-3N, 731-4N, 731-5N, 713-1N, 71…
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3500 to replace GB recirculation blower motors and potential implementation of Te…
Redesign and replace the stripper system regeneration piping to reduce/eliminate low points.…
The proposed work scope includes tasks to evaluate and repair the cause of damaged bolts on the CAEX No. 1 system in Building 292-F.…
The scope of this work order is to implement C-DCF-H-04726. Construction is to replace the drip pan tubing in building 234-H Room 22 with PVC pipin…
The proposed work scope includes corrective maintenance activities to repair the equipment associated with the 285-3/4F chiller.…
Subcontractor will perform a roof replacement on 702-D. The Subcontractor will disturb the existing roof on 702-D.…
Subcontractor will provide roof repairs to stop leaks at 735-4B.…