681-3G Elevator Replacement/Modernization…
Previous evaluation of the Variable Frequency Drives (VFD) for 735-2B Return Fans 001 and 003 has resulted in a determination that the VFDs have fa…
S8G prototype has been in service for over 30 years, its structural steel support systems require refurbishment and replacement.
The EEC covers the painting of exterior doors, sealing and coating of the base of south east corner of building 717-26N.…
Fire Alarm Panel Replacement in 681-17N.…
Subcontractor will repair roof at 713-1N.…
Toilets Removal/Replacement in K-Area Restroom Trailers.…
Re-lamping in 105-K…
Subcontractor will provide roof repairs at 704-H. The Subcontractor "will not" disturb the existing roof while performing these repairs on 704-H.…
Paint exterior areas at 784-3A.…