Renovate 784-7A restroom.…
Replace the tile and carpet in the 105-K Central Control Room…
This EEC covers the implementation via P-DCP-H-18001 for the relocation of part of the 234-H Finishing Line process to 233-H.…
Remodel of the kitchen area at 709-7G.…
This EEC covers all maintenance activities performed by Savannah River Tritium Enterprise (SRTE) organizations that have the potential to disturb g…
Bonneville Power Administration (BPA) proposes to enlarge a landing and replace a recently damaged wood pole structure on the Bandon-Rogue No. 1 hi…
Bonneville Power Administration (BPA) proposes to replace marker balls on 17 transmission lines in Benton, Chelan, Columbia, Douglas, Franklin, Gar…
Subcontractor will perform repairs to the roof on Bldg. 773-A.…
The F/HAL Instrument Air Compressor (IAC) No. 3 heat exchanger failed during extreme cold in early January.…
730-B LED Light installation.…